As part of our ongoing commitment to providing the very best for our customers Jenkins Marine regularly reviews the vessels and equipment available for marine projects. The quality and reliability of both vessels and associated plant and machinery can have a huge impact on both cost and, what are often, time sensitive marine projects. Read More
Jenkins Marine are back dredging in Haslar Marina for marina operators Dean and Reddyhoff. Haslar is an all tide 650 berth marina which requires regular maintenance dredging and this year there is an estimated 30,000m3 to dredge Read More
Back in April (See news article: "Who you Gonna Call"), Jenkins Marine was called to complete emergency repairs at a section of Poole Quay. Following emergency piling works to stabilise the failed quay wall at the residential/marina development, further detailed design and engineering works have been completed to produce a design for a more permanent repair... Read More
Who you gonna call? Obviously Jenkins Marine! Well, when you have a marine emergency anyway. And that's exactly who got called to carry out some emergency piling work in Poole when part of the quayside collapsed.
Read More
Marine civil engineers Red 7 Marine have been building a new ferry lay over berthing facility in East Cowes, Isle of Wight, for the Ferry operator ‘Red Funnel’. The project specification also necessitated dredging to ensure sufficient water depth for the new ferry, which marine dredging specialists Jenkins Marine were more than happy to complete. Read More
Jenkins Marine’s Dredging equipment has been kept busy this summer working near Fleetwood. 30m x 9m Backhoe Dredger ‘Doreen Dorward’ fitted with our 48t long reach excavator, and self propelled 300m3 capacity split hopper barge ‘NAB’ have been working for Specialist Marine Civil Engineering Firm ‘J. Murphy’ to provide dredging assistance for the installation of a large wastewater outfall in Anchorsholm. Read More
Jenkins Marine apprentice Jon and his mentor Chief Engineer Andy are shown above "passing the spanner" whilst working on main engine replacement for 14m multirole vessel ‘Buffalo’
Read More
Following the preliminary work carried out at the end of 2016 (see News Oct2016) Jenkins Marine have been assisting BAM Nuttall with the new £10 million quayside construction development in Poole harbour (the South Quay Project. Read More