Jenkins Marine have been working for Weymouth Harbour commissioners and the RNLI to undertake maintenance dredging within Weymouth harbour. Dredging has been requested for various areas including under the all-weather lifeboat berth where the existing mooring pontoon is currently removed for maintenance works. Read More
Jenkins Marine’s Dredging equipment has been kept busy this summer working near Fleetwood. 30m x 9m Backhoe Dredger ‘Doreen Dorward’ fitted with our 48t long reach excavator, and self propelled 300m3 capacity split hopper barge ‘NAB’ have been working for Specialist Marine Civil Engineering Firm ‘J. Murphy’ to provide dredging assistance for the installation of a large wastewater outfall in Anchorsholm. Read More
Jenkins Marine apprentice Jon and his mentor Chief Engineer Andy are shown above "passing the spanner" whilst working on main engine replacement for 14m multirole vessel ‘Buffalo’
Read More
With International Maritime Day in Poole, and Poole harbour Boat show approaching fast Jenkins Marine have been on a mission to take some pride in Poole, their base of operations. and restore some of the local maritime landmarks and features. Read More
Following the preliminary work carried out at the end of 2016 (see News Oct2016) Jenkins Marine have been assisting BAM Nuttall with the new £10 million quayside construction development in Poole harbour (the South Quay Project. Read More