The Port of Dover is currently undergoing development as part of its Dover Western Docks Revival project and Jenkins Marine have been tasked with dredging roughly 20,000m3 of silts, down to harder chalk bed material at roughly +1.8m Chart Datum Read More
We have been hard at work dredging at Ashlett Sailing Club near Calshot, Southampton, to restore the waterways to previously maintained depths. The project parameters require up to 2m depth of material to be removed, with disposal to Nab Tower spoil ground to the East of the Isle of Wight. Read More
Dredging has been underway at Poole Yacht Club to clear the entrance of accumulated sediment. This has built up since the last dredge operations in 2014. Founded in 1852, Poole Yacht Club is a much respected Sailing Club with a rich history and strong racing tradition... Read More
Winter dredging is well underway again with the new look split hopper barges Nab and Needles both back hard at work in the Solent area. Working together with our 30m x 9m backhoe dredger ‘Doreen Dorward’ and her onboard 50t long reach excavator, they enable dredging to continue around the clock to support marinas on the South Coast. They will be kept busy until Easter 2022 dredging Marinas!
Read More
Jenkins Marine was instructed by Isle of Wight Council to carry out a capital dredge in the River Medina where it approaches Newport harbour to increase the depth of the navigable channel. The full dredge length was over 500m from start point to its finish in Newport harbour. Read More
Jenkins Marine are excited to announce investment in new Prolec dig control system for dredging works. Supplied and installed by locally based James Fisher Prolec, the new electronic dig control system can be programmed with a customer's detailed dredge design profile and existing seabed survey. The excavator operator can control the bucket with much greater accuracy and has a visual display in the cab to show where they are Read More
Jenkins Marine is pleased to announce the purchase of the grab hopper dredger C.H. Horn from the Poole Harbour Commissioners (PHC). This is a significant investment in the dredging fleet for Jenkins Marine who have now secured a new ten-year contract to perform dredging services and provide marine support vessels for PHC within Poole Harbour and the Port of Poole. Read More
Jenkins Marine are back dredging in Haslar Marina for marina operators Dean and Reddyhoff. Haslar is an all tide 650 berth marina which requires regular maintenance dredging and this year there is an estimated 30,000m3 to dredge Read More
Jenkins Marine have been successful in securing a significant new long term dredge contract with international Marina owners and operators Marina Developments Limited (MDL).
MDL own several marinas on the south coast of England and Jenkins Marine have signed a new 3 year contract to provide maintenance dredging services for the Solent based sites, and surrounding areas. Read More
January 2019 saw Jenkins Marine start another maintenance dredging project at Woolverstone Marina, on the River Orwell, near Ipswich. This isn't the first time Jenkins have Dredged here. Previous dredge campaigns saw dredging completed by Jenkins Marine in 2010 and 2013, with ploughing work also completed over the years... Read More