Dredging has been underway at Poole Yacht Club to clear the entrance of accumulated sediment. This has built up since the last dredge operations in 2014. Founded in 1852, Poole Yacht Club is a much respected Sailing Club with a rich history and strong racing tradition... Read More
Winter dredging is well underway again with the new look split hopper barges Nab and Needles both back hard at work in the Solent area. Working together with our 30m x 9m backhoe dredger ‘Doreen Dorward’ and her onboard 50t long reach excavator, they enable dredging to continue around the clock to support marinas on the South Coast. They will be kept busy until Easter 2022 dredging Marinas!
Read More
Jenkins Marine was instructed by Isle of Wight Council to carry out a capital dredge in the River Medina where it approaches Newport harbour to increase the depth of the navigable channel. The full dredge length was over 500m from start point to its finish in Newport harbour. Read More
Jenkins Marine are excited to announce investment in new Prolec dig control system for dredging works. Supplied and installed by locally based James Fisher Prolec, the new electronic dig control system can be programmed with a customer's detailed dredge design profile and existing seabed survey. The excavator operator can control the bucket with much greater accuracy and has a visual display in the cab to show where they are Read More
Jenkins Marine is pleased to announce the purchase of the grab hopper dredger C.H. Horn from the Poole Harbour Commissioners (PHC). This is a significant investment in the dredging fleet for Jenkins Marine who have now secured a new ten-year contract to perform dredging services and provide marine support vessels for PHC within Poole Harbour and the Port of Poole. Read More
Jenkins Marine are back dredging in Haslar Marina for marina operators Dean and Reddyhoff. Haslar is an all tide 650 berth marina which requires regular maintenance dredging and this year there is an estimated 30,000m3 to dredge Read More
Jenkins Marine have been successful in securing a significant new long term dredge contract with international Marina owners and operators Marina Developments Limited (MDL).
MDL own several marinas on the south coast of England and Jenkins Marine have signed a new 3 year contract to provide maintenance dredging services for the Solent based sites, and surrounding areas. Read More
Jenkins Marine have been working for Weymouth Harbour commissioners and the RNLI to undertake maintenance dredging within Weymouth harbour. Dredging has been requested for various areas including under the all-weather lifeboat berth where the existing mooring pontoon is currently removed for maintenance works. Read More
Jenkins Marine’s Dredging equipment has been kept busy this summer working near Fleetwood. 30m x 9m Backhoe Dredger ‘Doreen Dorward’ fitted with our 48t long reach excavator, and self propelled 300m3 capacity split hopper barge ‘NAB’ have been working for Specialist Marine Civil Engineering Firm ‘J. Murphy’ to provide dredging assistance for the installation of a large wastewater outfall in Anchorsholm. Read More