CH Horn has returned to Dover to complete work started there last Summer. The Port of Dover is currently undergoing development as part of its Western Docks Revival project and Jenkins Marine were tasked with dredging roughly 20,000m3 of silts from the existing Wellington Dock Marina, down to harder chalk bed material at roughly +1.8m Chart Datum... Read More
C H Horn is a 26m long, modern, compact and efficient self-propelled hopper which was formerly equipped with a fixed grab crane. The fixed crane has now been removed to allow room on its deck for a specially modified tracked Hyundai Excavator. Read More
Jenkins Marine's dredging teams will be kept busy for the next few months supporting our clients in the South Coast area of operations, along with some projects around the South Eastern coast, as another packed dredging season gets underway. Read More
The Port of Dover is currently undergoing development as part of its Dover Western Docks Revival project and Jenkins Marine have been tasked with dredging roughly 20,000m3 of silts, down to harder chalk bed material at roughly +1.8m Chart Datum Read More
We have been hard at work dredging at Ashlett Sailing Club near Calshot, Southampton, to restore the waterways to previously maintained depths. The project parameters require up to 2m depth of material to be removed, with disposal to Nab Tower spoil ground to the East of the Isle of Wight. Read More
Dredging has been underway at Poole Yacht Club to clear the entrance of accumulated sediment. This has built up since the last dredge operations in 2014. Founded in 1852, Poole Yacht Club is a much respected Sailing Club with a rich history and strong racing tradition... Read More
Winter dredging is well underway again with the new look split hopper barges Nab and Needles both back hard at work in the Solent area. Working together with our 30m x 9m backhoe dredger ‘Doreen Dorward’ and her onboard 50t long reach excavator, they enable dredging to continue around the clock to support marinas on the South Coast. They will be kept busy until Easter 2022 dredging Marinas!
Read More
The winter dredging season got under way this month at Haslar Marina with our Multi-role dredging veteran Doreen Dorward and a new look split hopper barge NAB on site to carry out the work. The 300m³ capacity self-propelled, split hopper barge returns to work after a few months of refit work to install a new wheelhouse and bowthruster! Read More
Jenkins Marine was instructed by Isle of Wight Council to carry out a capital dredge in the River Medina where it approaches Newport harbour to increase the depth of the navigable channel. The full dredge length was over 500m from start point to its finish in Newport harbour. Read More
With the start of our Winter 2020 dredging season, we kicked off early in November from our home port of Poole, headed for Southampton, River Hamble and then ventured west up to Chichester Harbour and are imminently on our way to the Isle of Wight to continue on for the next few months. Read More