We have been hard at work dredging at Ashlett Sailing Club near Calshot, Southampton, to restore the waterways to previously maintained depths. The project parameters require up to 2m depth of material to be removed, with disposal to Nab Tower spoil ground to the East of the Isle of Wight. Read More